Cost baseline: measure today's cost before you change it

How to set a cost baseline before outsourcing or changing a process: what to count, a worked example, common gaps, and how to keep comparisons fair.

By Dhanushka Pinto, Co-founder / DirectorPublished 7 min read
Cost baseline: key takeaways infographic by Global Bridge Labs
Key takeaways from this article. Share it with the link and credit Global Bridge Labs.
On this page

Key takeaways

A cost baseline is a documented measure of what a process costs today, taken before anything changes. Without one, no saving can be proved or disproved. A sound baseline records volume, hours, loaded hourly cost, error rate and turnaround for the same period. Two weeks of logging is enough for most routine processes.

  • A baseline is today's cost, measured before any change.
  • Record 5 things: volume, hours, loaded rate, errors and turnaround.
  • 2 weeks of logging is enough for most routine work.
  • Use the same definition before and after, or the saving is fiction.

Want help setting a baseline for one process? Message us on WhatsApp with the process and who does it.

Chat on WhatsApp →

What is a cost baseline?

A cost baseline is the agreed starting figure against which future costs are compared. For an operational process, it states what the work costs per period and per unit now, with the assumptions written down. It is the before in any before-and-after comparison.

Why do savings claims fail without one?

Savings claims fail without a baseline because memory flatters the past and invoices flatter the present. An owner recalls the old process as one salary. The new arrangement shows up as a clear monthly bill. The comparison is between a guess and a fact, and it can be argued either way.

The UK government's Green Book on appraisal warns of optimism bias: the tendency to overstate benefits and understate costs. A written baseline is the simplest defence.

What should a baseline include?

A baseline should include every cost that would change if the process changed, and enough quality data to show the work was comparable.

  • Volume: items completed in the period.
  • Hours: time spent by everyone who touches the work.
  • Loaded rate: wage plus employer costs and holiday, per worked hour.
  • Direct costs: software, postage and other spend tied to the process.
  • Quality: error or rework rate.
  • Speed: average turnaround.

What does a worked baseline look like?

Take sales invoicing in an illustrative firm. Over two weeks, 180 invoices are raised. The office manager spends 21 hours at a loaded £23.20 per worked hour and the owner spends 3 hours checking, valued at £40. Labour is £487 plus £120, or £607. Software tied to invoicing is £15 for the fortnight.

The baseline is £622 for 180 invoices, or about £3.46 per invoice. Twenty-two invoices were queried or reissued, an error rate of about 12%. Average time from job completion to invoice was 9 days.

  • Cost per invoice: about £3.46.
  • Error rate: about 12%.
  • Turnaround: 9 days from completion to invoice.

Want your own baseline built from a time log? Send us the log on WhatsApp.

Chat on WhatsApp →

How do you collect the data?

Collect it with a simple time log and counts from your systems. Ask everyone who touches the process to record their time in 15-minute blocks for two weeks. Pull the volume from the software. Count corrections by hand if you must.

  • 1. Define where the process starts and ends.
  • 2. Log time for two typical weeks.
  • 3. Count items completed and items corrected.
  • 4. Apply loaded hourly rates.
  • 5. Write down every assumption.

What are the common gaps?

The common gaps are leaving out senior people's time, ignoring rework, picking an unusually quiet or busy fortnight, and forgetting the cost of supervision. Each makes the old process look cheaper than it was. The opposite error is loading on costs that will not change, such as rent, which inflates the saving.

What does this look like in practice?

A pattern we see a few months after a change: someone asks whether it has saved money, and nobody can say, because the only before figure is an impression. The businesses that can answer are the ones that spent two weeks logging first. The log also tends to reveal savings that need no outsourcing at all.

Cost baseline checklist

Confirm each item before changing the process.

  • Process boundaries are written down.
  • Two typical weeks are logged.
  • Everyone who touches the work is included.
  • Rates are loaded, not just salary.
  • Errors and turnaround are recorded.
  • Assumptions are listed and dated.
  • The same method will be used after the change.

Next step

Choose the process you are most likely to change this year. Tell us who does it and roughly how often, and we will help you set a baseline you can rely on later.

Message us on WhatsApp to set a cost baseline, or book a 30-minute consultation.

Chat on WhatsApp →

Sources and further reading

Frequently asked questions

What is a cost baseline?

A cost baseline is a documented measurement of what a process or activity costs at a point in time, used as the reference for judging later changes. It records volume, time, hourly cost, quality and speed, with the assumptions behind each figure.

How long should a baseline period be?

Two weeks is enough for most routine, high-volume processes, provided the weeks are typical. Monthly or seasonal processes need a longer period or data from past cycles. The aim is a period that represents normal working, not the best or worst case.

What costs should be left out of a baseline?

Leave out costs that will not change whatever you decide, such as rent on space you would keep or software you would still need. Including them makes the current process look more expensive and overstates the saving from changing it.

Who should own the baseline?

The person accountable for the process should own it, with finance checking the rates and arithmetic. If a provider is involved, share the baseline and agree it together before work starts, so both sides measure the result the same way.

Written by

Dhanushka Pinto
Dhanushka Pinto
Co-founder / Director

Global Bridge Labs (GBL) is a UK–Sri Lanka partner for social media, websites and BPO. Everything here comes from client delivery, not theory.

Share this article

Reading is good.
Fixing is better.

30 minutes with our team and you'll leave knowing which of the three problems to fix first.

Get a Free Quote →
Keep reading