On this page
Key takeaways
RAMS, risk assessments and method statements, are documents contractors prepare to show how work will be done safely. Principal contractors usually ask for them before work starts. Much of the preparation is repetitive: adapting templates, adding site details, attaching certificates and tracking versions. The safety judgement must come from a competent person who knows the work.
- Templates by task type speed up every RAMS.
- Site-specific details make each one valid.
- A competent person reviews and signs off.
- Version control shows which RAMS was briefed.
RAMS requests delaying site starts? Message us on WhatsApp with how many you produce a month.
Chat on WhatsApp →What is a RAMS document?
RAMS combine a risk assessment, which identifies hazards and controls, with a method statement, which sets out the safe sequence of work. RAMS is an industry term rather than a legal one, but the Management of Health and Safety at Work Regulations require suitable risk assessments, and the Construction (Design and Management) Regulations 2015 set duties for planning construction work.
Which parts of RAMS preparation are admin?
The structure and much of the content repeat between jobs of the same type. The admin work is adapting the right template and assembling the pack.
- Choosing the template for the task type.
- Adding site address, contacts and programme.
- Attaching training cards, insurances and certificates.
- Formatting to the client's required layout.
- Logging versions and who was briefed.
What does RAMS admin take?
In an illustrative example, a subcontractor produces 15 RAMS a month at about 2 hours of assembly each, around 30 hours, usually by a supervisor. These are example figures. Templates and a dedicated assembler can halve the time, leaving the supervisor to review the site-specific risks.
Send us your monthly RAMS count on WhatsApp and we will estimate the routine with you.
Chat on WhatsApp →What must stay with a competent person?
The hazard identification, controls and safe method must be decided by someone competent in the work, who knows the site. A support team must never invent controls or copy a RAMS from another site without review. Generic RAMS that do not reflect the site are a common finding when things go wrong.
What does this look like in practice?
A pattern we see: a start is delayed because the principal contractor rejects RAMS missing an insurance certificate. A pack checklist and a current certificate library stop that.
RAMS preparation checklist
Check every pack before it is sent.
- Correct template for the task.
- Site-specific details added.
- Certificates and cards attached and current.
- Reviewed and signed by a competent person.
- Version and briefing recorded.
Next step
Send us a recent RAMS and how it was produced. We will suggest templates and a routine, and say plainly what a team could assemble for your review.
Message us on WhatsApp about RAMS preparation, or book a 30-minute consultation.
Chat on WhatsApp →Sources and further reading
- Construction (Design and Management) Regulations 2015 · Health and Safety Executive
- What are the Management Standards for work-related stress? · Health and Safety Executive
Frequently asked questions
What does RAMS stand for?
RAMS stands for risk assessment and method statement. Together they describe the hazards of a piece of work, the controls in place and the safe sequence for doing it. Principal contractors usually ask subcontractors for RAMS before work starts on site.
Are RAMS a legal requirement?
RAMS as a format is an industry practice, but the underlying duties are legal: employers must carry out suitable risk assessments, and the CDM Regulations 2015 require construction work to be planned and managed safely. Clients and principal contractors often make RAMS a contract condition.
Can RAMS preparation be outsourced?
The assembly can be: adapting templates, adding site details, attaching certificates and formatting. The risk assessment and method must be decided and signed off by a competent person who knows the work and the site. Never use a RAMS from another site without proper review.
Written by

Global Bridge Labs (GBL) is a UK–Sri Lanka partner for social media, websites and BPO. Everything here comes from client delivery, not theory.




